Your Shopping Cart
CHECKLIST FOR A PROPERLY PLANNED PROJECT

Provider: TAPPI
REVISED: 2018
Shipping: Available for download - Link will be provided in My ComplianceOnline section
REVISED: 2018
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price:
$49.00
Product Details
- This Technical Information Paper is an instrument for guiding and auditing the planning phase of capital project development. It can be applied to a wide range of project types and sizes. The primary function of this TIP is to verify that the factors and issues that impact project success have been addressed in a systematic manner. The checklist establishes schedule milestones for each activity of the three basic phases of the project planning process. Another function of the TIP is to assign ownership to the various planning activities. TIP 0408-01 provides a useful tool for evaluating the readiness to proceed to the next step of project implementation.
- The checklist includes activities common to all capital projects; however some activities listed would only be appropriate for more complex projects. Therefore the activities listed are to prompt thought, i.e. does my project involve any aspect of environmental impact? The activities are arranged from top to bottom in the order of thought as one approaches the project. Activities are selected as appropriate for the project, responsibilities and schedules defined.
It Provides information on:
- Scope.
- Keywords.
It Benefits:
- Production Manager.
- Operations Manager.
- Auditors.
- Accountants.
Customers Also Bought
- UIDELINES FOR SPECIFICATION AND INSPECTION OF ELECTRIC RESISTANCEWELDED (ERW) AND SEAMLESS BOILER TUBE FOR CRITICAL AND NONCRITICALSERVICE
Price: $35 BUY NOW - INSTALLATION AND REPAIR OF PIN STUDS IN BLACK LIQUOR RECOVERY BOILERS
Price: $35 BUY NOW - WELD REPAIRS ON NEW SUCTION ROLL SHELLS
Price: $35 BUY NOW - Ultrasonic testing (UT) for tube thickness measurement in black liquor recovery boilers: Part I - Guidelines for accurate tube thickness testing; Part 2 - Default layouts for tube thickness surveys in various boiler zones
Price: $35 BUY NOW - Guidelines for nondestructive examination of suction roll shells
Price: $35 BUY NOW - GTAW ROOT PASS WELDING OF 6% MOLYBDENUM AUSTENITIC STAINLESS STEEL PIPE - OPEN ROOT JOINT WITH HAND-FED FILLER
Price: $35 BUY NOW
You Recently Viewed